If you’ve been reading the APS blog, then you know that we feel strongly about the merits of making your design decisions in collaboration with your builder, as early in your commercial construction process as possible, to get a head start on value-engineering your project.
san diego design and build
How to Title 24
The inspiration behind Title 24 is for good, but the stringent requirements are costing owners on average $3-6 more per sqft upfront.
Green Building: The Paper Straws of Construction
How do we combat negative environmental impact when we all have things to do? If you’ve got a construction or tenant improvement project to do and you’re thinking about paper straws, read on about building out your space with less negative environmental impact (and without blowing the budget).
A Graceful Build Out for Your Franchise: Steps & Tips
You’ve qualified (congrats!) and signed onto a franchise, and have identified your new space, so now what?
The Big 3 Before You Sign the Lease
There is not always an advocate for the lessee in the lease negotiation process. Hiring a design build general contractor to help guide you can save tens or even hundreds of thousands of dollars.